{"product_id":"safety-first-compressor-pump-down-sign-cgap-i04191-812","title":"SAFETY FIRST Compressor Pump-Down Sign, Follow Written Pump-Down Steps, for Cold Storage Warehouses, 8x12 Rust-Resistant Aluminum Sign by CGAP Safety","description":"\u003cp\u003eFollow Written Pump-Down Steps. This SAFETY FIRST Compressor Pump-Down sign from CGAP Safety reads: \u003cstrong\u003eCOMPRESSOR PUMP-DOWN \/ FOLLOW THE WRITTEN STEPS \/ CONFIRM PRESSURE BEFORE OPENING \/ LOG THE TIME AND YOUR NAME\u003c\/strong\u003e. Written for cold storage warehouses, food processing plants, meat and poultry plants, dairies, ice plants and distribution centers.\u003c\/p\u003e\u003ch3\u003eWhy this sign matters\u003c\/h3\u003e\u003cp\u003eKeeps compressor pump-down done in the same order with pressure confirmed and the work logged.\u003c\/p\u003e\u003ch3\u003eWhere to post it\u003c\/h3\u003e\u003cp\u003eMount on the wall beside the compressor control panel at eye level.\u003c\/p\u003e\u003ch3\u003eWho orders it\u003c\/h3\u003e\u003cp\u003eRefrigeration engineers, plant maintenance leads, compressor operators, refrigeration contractors, cold-storage facility managers.\u003c\/p\u003e\u003cp\u003eRust-resistant .065 aluminum, UV-resistant print, pre-drilled in all four corners. Made in the USA. Related standards and practice to review for your site: ANSI Z535.2 safety instruction; written site operating procedures; IIAR 9 practice. A sign supports your site procedures; it does not replace training or supervision.\u003c\/p\u003e","brand":"CGAP Industries","offers":[{"title":"Default Title","offer_id":68081642340596,"sku":"CGAP-I04191-812","price":29.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0788\/2771\/6852\/files\/cgap-i04191-812.jpg?v=1794156783","url":"https:\/\/cgapindustries.com\/products\/safety-first-compressor-pump-down-sign-cgap-i04191-812","provider":"CGAP Safety","version":"1.0","type":"link"}