Collection: Hot Work and Welding Signs

Signs for welding, cutting, brazing and other hot work: hot work permit areas, fire watch, welding screens and curtains, oxy-fuel cylinders and the places where sparks can reach combustibles.

Where to post

  • Welding bays, booths and screens.
  • Areas where hot work needs a permit, and areas where it is not allowed.
  • Near combustibles, dust or flammable vapor.
  • Fire watch stations and extinguisher points.
  • Oxy-fuel cylinder storage and carts.

Standards to know

OSHA 1910.252 covers fire prevention for welding and cutting, including inspecting the area and authorizing the work, preferably with a written permit, and a fire watch that in many cases stays at least half an hour after the work ends. NFPA 51B is the common reference for hot work permit programs, and its 2019 edition keeps the fire watch for at least one hour. Construction work falls under 29 CFR 1926 Subpart J.

Signing a whole site?

Our kits put every sign one area needs in a single order, priced below buying the same signs one at a time.

Common questions

Do you make hot work permit signs?

Yes, several, and we make custom versions with your permit process or contact.

Who buys these?

Fab shops, plants, shipyards, refineries, maintenance departments and contractors.

Full guide: Hot work permit and fire watch guide

Every sign is 8x12 inch .065 rust-resistant aluminum with UV-stable inks and pre-drilled corners, made in the USA, and ships from Amory, Mississippi within 2 business days. Mix any signs for quantity pricing: 10% off at 5, 15% off at 10 and 20% off at 20 or more.